My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2014 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 2:30:29 PM
Creation date
4/10/2019 4:46:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014 - 2018
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> SWRCB,January 2002 FOP U 8 op 16 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING AL <br /> Test Method Developed By: ❑UDC Manufacturer Industry Standard X Profession ii'Tinettronrinal= rr <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> C# 1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: Environ Environ Environ Environ <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 29 %" 28 '/2" 29'/2" 29 ''/2" <br /> Height from UDC Bottom to Top 9" 9" 9" 9" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to No Electrical No Electrical No Electrical No Electrical <br /> Lowest Electrical Penetration: Penetrations Penetrations Penetrations Penetrations <br /> Condition of UDC prior to Dry Dry *Small amount of Dry <br /> testing: Diesel <br /> Portion of UDC Tested' Water Level 11" Water Level 1 I" Water Level 11" Water Level 11" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?* <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 11:10 11:15 11:20 11:25 <br /> Initial Reading(Ri): .001 .001 .001 .001 <br /> Test End Time: 11:40 11:45 11:50 11:55 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes _ <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Wiped out a small amount of Diesel from UDC#5&6 prior to testing. <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.