Laserfiche WebLink
Ub T SYSTEM RETROFIT OR REPAIK <br />(Submit minimum of 3 sets of plans& applications as originals will be retained by EHD) OCT 2 2014 <br />1. Site map enclosed? YES [ ] 0>� . <br />2. Submit copies of ICC Service Technician and/or Installers certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan'. is available. on the jobsite.as. required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showinglocation of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />3 1. <br />