Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan 0 C T 16 2014 <br />Site Address: FLAG CITY CHEVRON 6421 CAPITOL AVE. LODI, CA 95240 ENVIR MENTAL HEALTH <br />. . . . . COCO . VENTS. . . . <br />ULPAH I MEN I. <br />. . . . . . . . . VENT SUMP . . . . . . . . . . . . . <br />. .. 91. . . <br />. . .. 87 SLAVE. O 87 MAIN.. DIESEL . <br />O O O <br />O <br />O V O O <br />V <br />X <br />V O O X <br />O O O O <br />A=ANNULAR <br />F=FILL <br />V=VAPOR <br />P=PROBE <br />T='TURBINE <br />X=SENSOR <br />. . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . <br />Date map was drawn: 7/26/11. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />