Laserfiche WebLink
SAN aJOAQUIN COUNTY <br />_NVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br />Flag City Chevron <br /># <br />Address: 6421 Capitol Ave. Lodi, CA 95242 <br />Date:Sep 4, 2013 <br />Name: <br />Code Section <br />HSC =California Health and Safety Code; CCR = California Code of R ulations <br />C1 =Class 1 violation; C2 =Class 2 violation; M =Minor violation <br />Facility <br />Kiumars Khajevandi/Haleh & Azad Amid <br />Title: Partners <br />�y°Lj) 838-2621 <br />Contact: <br />104 HSC 25292.2 Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 CCR 2711 Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />106 X CCR 2632(b) Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or fails to completely show where monitoring is performed <br />Inspection <br />X Routine i i Monitoring System Certification n Installation I I Complaint —I[)#: S R0066648 �� XOther: SR0067880 <br />Type: <br />110 HSC 25291(f) Annual line leak detector test not performed {M1) <br />111 HSC 25284.2 Annual spill containment testing not performed <br />(Authority HSC 25289) <br />Kiumars Khajevandi Title: Partner <br />Consent for. inspection $Sampling 7Photos <br />115 CCR 2660(k) Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br />ermit conditions <br />Granted by: <br />Monitoring <br />Veeder-Root TLS -350 <br />Piping <br />XPressurized Ii Suction Il Gravity <br />Overfill <br />Prevention: XMechanical Ll Audible/visual <br />Panel: <br />System: <br />Maintenance & monitoring records not maintained 3 years, cathodic protection records for 6'/] years, written <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />X CCR 2712(b) upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, round water elevations, or other test results; 6 results of inventory readings and reconciliations <br />202 <br />UST6__ <br />203 <br />7 <br />8 <br />9 ----- <br />------------ <br />- --------- <br />[ ------------- I <br />--------------- <br />--------- ] <br />Product <br />......... <br />87 -octane <br />87 -octane <br />DSL <br />91 -octane <br />Designatedicc <br />Alex Jabbari <br />Exp. <br />10-6-14 <br />Violations: X M 1 -Release Detection 11 M2 -Release Prevention a M3 — Both <br />Operator <br />Date: <br />onsite service' <br />Felix Ramirez <br />Manufacturer's <br />12-6-14 vmi 11-10-13, swrcb 5-31-14, vr6-25-14vate <br />Technician: <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code Section <br />HSC =California Health and Safety Code; CCR = California Code of R ulations <br />C1 =Class 1 violation; C2 =Class 2 violation; M =Minor violation <br />File Revlew <br />101 HSC 25284 No permit to operate <br />102 HSC 25404.5 Annual operating fees not paid <br />103 NSC 25284(a)(3) No written agreement between the person that the operating permit was issued to and the tank operator to <br />monitor the tanks stem <br />104 HSC 25292.2 Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 CCR 2711 Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />106 X CCR 2632(b) Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or fails to completely show where monitoring is performed <br />108 X CCR 2637 Secondary containment: (a) test not performed; (e) test report not submitted within 30 days; (f) test notification <br />not provided to the EHD at least 48 hours prior to conducting the test <br />Monitoring equipment certification: (a) not performed annually; (d) test report not submitted within 30 days: <br />109 X CCR 2638 (e) test notification not provided to the EHD at least 48 hours prior to conducting an installation, repair, <br />re lacement, calibration, or certification <br />110 HSC 25291(f) Annual line leak detector test not performed {M1) <br />111 HSC 25284.2 Annual spill containment testing not performed <br />112 CCR 2636(f)(4) Annual tine tightness test not performed if positive shutdown or fail safe not present {Mi) <br />113 CCR 2715(a) Failed to inform the EHD of a change of designated operator within 30 days <br />114 CCR 2715(b) Designated operator does not possess a current ICC CA UST System Operator certification <br />115 CCR 2660(k) Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br />ermit conditions <br />116 HSC 25292.5 Enhanced leak detection (ELD) testing not performed on a system located within 1000' of public well, or <br />failures not repaired and retested <br />117 CCR 2661 Permit to repair UST system not obtained <br />118 HSC 25286(a) Operational permit not amended when UST storage and/or monitoring system changed <br />119 HSC 25298(b) Permit to temporarily dose UST system not obtained <br />120 HSC 25298(c) Permit to close UST system not obtained <br />On Site Records <br />201 <br />Maintenance & monitoring records not maintained 3 years, cathodic protection records for 6'/] years, written <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />X CCR 2712(b) upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, round water elevations, or other test results; 6 results of inventory readings and reconciliations <br />202 <br />X CCR 2712(1) Monitoring plan, response plan, and/or operating permit and all conditions not onsite <br />203 <br />Unauthorized release that: (c) did not escape secondary containment and cleaned up within eight hours (M1) <br />CCR 2650 was not recorded; (e) escaped secondary containment, not cleaned ul after eight hours, or a sudden loss of <br />product was not reported to the EHD within 24 hours __ <br />Inspector: Received By: Title: <br />Aris Cacapit (209) 468-3453 _ <br />EHD 23-02 Rev 04/19/12 Page 1 UST INSPECTION REPORT <br />