My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 4:37:31 PM
Creation date
4/18/2019 10:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220094
PE
2247
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DTSC APPROVAL <br /> 12.1. Respondent shall revise any workplan, report, specification, or <br /> schedule in accordance with DTSC's written comments. Respondent shall submit to <br /> DTSC any revised documents by the due date specified by DTSC. Revised submittals <br /> are subject to DTSC's approval or disapproval. <br /> 12.2. Upon receipt of DTSC's written approval, Respondent shall commence <br /> work and implement any approved workplan in accordance with the schedule and <br /> provisions contained therein. <br /> 12.3. Any DTSC-approved workplan, report, specification, or schedule <br /> required under this Consent Agreement shall be deemed incorporated into this Consent <br /> Agreement. <br /> 12.4. Verbal advice, suggestions, or comments given by DTSC <br /> representatives will not constitute an official approval or decision. <br /> SUBMITTALS <br /> 13.1. Beginning with the first full month following the effective date of this <br /> Consent Agreement, Respondent shall provide DTSC with quarterly progress reports of <br /> corrective action activities conducted pursuant to this Consent Agreement. Progress <br /> reports are due on the first day of the first month following the close of each reporting <br /> period. The progress reports shall conform to the Scope of Work for Progress Reports <br /> contained in Attachment 7. DTSC may adjust the frequency of progress reporting to be <br /> consistent with site-specific activities. <br /> 13.2. Any report or other document submitted by Respondent pursuant to <br /> this Consent Agreement shall be signed and certified by the project coordinator, a <br /> responsible corporate officer, or a duly authorized representative. <br /> 13.3. The certification required by paragraph 13.2 above, shall be in the <br /> following form: <br /> I certify that the information contained in or accompanying this submittal is <br /> true, accurate, and complete. As to those portions of this submittal for which <br /> I cannot personally verify the accuracy, I certify that this submittal and all <br /> attachments were prepared at my direction in accordance with procedures <br /> designed to assure that qualified personnel properly gathered and evaluated <br /> the information submitted. <br /> Signature: <br /> Name: <br /> Title: <br /> Date: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.