My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 4:37:31 PM
Creation date
4/18/2019 10:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220094
PE
2247
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stephen W. Lavinger, Chief <br /> Tiered Permitting Corrective Action Branch <br /> Hazardous Waste Management Program <br /> Department of Toxic Substances Control <br /> 5796 Corporate Avenue <br /> Cypress, California 90630 <br /> 19.2. If Respondent retains or employs any agent, consultant, or contractor <br /> for the purpose of carrying out the terms of this Consent Agreement, Respondent will <br /> require any such agents, consultants, or contractors to provide Respondent a copy of all <br /> documents produced pursuant to this Consent Agreement. <br /> 19.3. All documents pertaining to this Consent Agreement shall be stored in <br /> a central location at the Facility, or at a location otherwise agreed to by the parties, to <br /> afford easy access by DTSC and its representatives. <br /> DISPUTE RESOLUTION <br /> 20.1. The parties agree to use their best efforts to resolve all disputes <br /> informally. The parties agree that the procedures contained in this section are the sole <br /> administrative procedures for resolving disputes arising under this Consent Agreement. <br /> If Respondent fails to follow the procedures contained in this section, it shall have <br /> waived its right to further consideration of the disputed issue. <br /> 20.2. If Respondent disagrees with any written decision by DTSC pursuant <br /> to this Consent Agreement, Respondent's Project Coordinator shall orally notify DTSC's <br /> Project Coordinator of the dispute. The Project Coordinators shall attempt to resolve <br /> the dispute informally. <br /> 20.3. If the Project Coordinators cannot resolve the dispute informally, <br /> Respondent may pursue the matter formally by placing its objection in writing. <br /> Respondent's written objection must be forwarded to Chief, Tiered Permitting Corrective <br /> Action Branch, Hazardous Waste Management Program, Department of Toxic <br /> Substances Control, with a copy to DTSC's Project Coordinator: The written objection <br /> must be mailed to the Branch Chief within 14 days of Respondent's receipt of DTSC's <br /> written decision. Respondent's written objection must set forth the specific points of the <br /> dispute and the basis for Respondent's position. <br /> 20.4. DTSC and Respondent shall have 14 days from DTSC's receipt of <br /> Respondent's written objection to resolve the dispute through formal discussions. This <br /> period may be extended by DTSC for good cause. During such period, Respondent <br /> may meet or confer with DTSC to discuss the dispute. <br /> 20.5. After the formal discussion period, DTSC will provide Respondent with <br /> its written decision on the dispute. DTSC's written decision will reflect any agreements <br /> reached during the formal discussion period and be signed by the Branch Chief or <br /> his/her designee. <br /> 20.6. During the pendency of all dispute resolution procedures set forth <br /> above, the time periods for completion of work required under this Consent Agreement <br /> that are affected by such dispute shall be extended for a period of time not to exceed <br /> the actual time taken to resolve the dispute. The existence of a.dispute shall not excuse, <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.