My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 3:50:11 PM
Creation date
4/24/2019 1:40:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Geoffrey Rader <br /> Page 6 of 7 <br /> on a trend of decrease. Although this is not a leaking underground storage tank contamination <br /> case, we believe that the criteria in the SWRCB Low Threat Underground Storage Tank Case <br /> Closure Policy (LTCP) are relevant and appropriate and that this case may meet the criteria for <br /> closure. We recommend preparation of a Low Threat Case Closure Evaluation Report. <br /> If you have any questions or comments concerning this report, please contact Ground Zero at your <br /> convenience. <br /> Respectfully, <br /> Ground ero Analysi , Inc. <br /> Joseph L. Vasquez, Sv3NAL G <br /> Staff Geologist QHS Fp�oc <br /> a GREGORY P. N1 <br /> STML <br /> Grego y a 1, PG 5023 N0 5023 <br /> (P <br /> CA Certified Hydrogeologist 264 <br /> F OF CAUF�Q <br /> Figures: <br /> 1: Site Location Map <br /> 2: Site Plan <br /> 3: Groundwater Gradient Map (December 2018) <br /> 4: Groundwater Gradient Map (March 2019) <br /> 5: TPHg Isoconcentration Map (March 2019) <br /> 6: TPHd Isoconcentration Map (March 2019) <br /> 7: Benzene Isoconcentration Map (March 2019) <br /> 8: MTBE Isoconcentration Map (March 2019) <br /> Tables: <br /> 1: Monitoring Well Construction Details <br /> 2: March 2019 Groundwater Monitoring and Analytical Data <br /> 3: Cumulative Groundwater Elevation Monitoring Data <br /> 4: Free Product Removal from Monitoring Well MW6R <br /> 5: Free Product Removal from Monitoring Well MW8 <br /> 6: Free Product Removal from Monitoring Well MW9/MW9R <br /> 7: Free Product Removal from Vapor Extraction Well VEW 1-D <br /> 8: SVE System Monitoring & Mass Removal Data <br /> 9: Soil Vapor Analytical Results <br /> 10: Cumulative Groundwater Analytical Results <br /> 11: Cumulative Groundwater Analytical Results—Oxygenates <br />
The URL can be used to link to this page
Your browser does not support the video tag.