My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15453
>
2200 - Hazardous Waste Program
>
PR0522841
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 1:37:42 PM
Creation date
4/25/2019 1:18:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0522841
PE
2230
FACILITY_ID
FA0015491
FACILITY_NAME
PROFLEET TRUCK LUBE
STREET_NUMBER
15453
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02519006
CURRENT_STATUS
01
SITE_LOCATION
15453 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond von Flue [EH] <br />From: Profleet [profleet@sbcglobal.net] <br />Sent: Sunday, February 13, 2005 9A3 AM <br />To: Raymond von Flue [EH] <br />Subject: Profleet Truck Lube inspection update <br />PROFLEET TRUCK LUBE <br />15453 N. THORNTON RD. <br />LODI, CA 95242 <br />TEL: 209-333-8383 <br />FAX: 209-333-8353 <br />February 13, 2005 <br />Dear Mr. Von Flue, <br />Page 1 of 2 <br />This email is to update as to where we are in complying with your 1-21-05 inspection of our facility. <br />1. Our business management plan will be updated on line by 2-21-05. <br />2. We have an employee meeting scheduled for 2-20-05 to do the necessary business plan and <br />hazardous materials handling procedures training. I will have the meeting records signed at that time. <br />3. Labels have been ordered for our above ground tanks but will not be done by 2-21-05. <br />4. We now have a barrel for our absorbent pads. Where should we put the line around the barrel you <br />mentioned that would start the time line on when it should be processed? I think you said 2/3rds or <br />was it 1/2 full? (Picture attached) <br />5. We have changed the way oil is to be handled in front of the oil storage room and will be doing our <br />best to mitigate the stained area. <br />6. Decals are on order for the satellite used oil/diesel filter barrels and will not be here by 2-21-05. All <br />old labels have been removed awaiting the new labels and they are emptied within 24 hours. <br />7. Diesel 1/4 barrel labels will be made also. What size lettering on these and do they need any other <br />information on them? <br />8. The SPCC Plan will be updated on line and a copy kept in lunch room for all employees to have <br />access to it. <br />Ted from Fremouw Environmental Services, Inc. will be calling you to ask a few questions and update <br />you as to how are waste oil and sump cleaning is handled. <br />Are there any size requirements for the lettering on the decals we are having made and what they <br />should say other than "Drained Used Oil and Diesel Filters, Emptied Daily"? They are awaiting our <br />input before having them made. <br />2/14/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.