Laserfiche WebLink
THE PLD AOSTeP LEAK'OTES <br /> T <br /> I The Red Jacket PLD leak detector is duct escapes from the system as is the PLD to open to the full-flow posi- <br /> a pressure-sensing, piston-operated metered in through the PLD. Under tion. In a system with no leaks, it <br /> valve designed to indicate a leak in this condition pressure cannot build takes approximately two seconds for <br /> the piping between the leak detector up in the piping system. When a noz- a complete test. No further line <br /> and the dispenser. zle is opened, a poppet in the PLD testing takes place until the line <br /> When the submerged pump is turn- moves to a position that restricts the pressure drops below 1 psi. <br /> ed on, a controlled amount of product flow to approximately 11/7 to 3 GPM. <br /> (three gallons per hour) is metered This is the indication to the operator NOTE: For PLD to operate properly, <br /> through the PLD into the piping sys- that a leak is present. submersible pumping unit must be <br /> tem. If a leak is present that equals If there are no leaks, pressure able to produce a minimum of 22 psi. <br /> or exceeds this amount, as much pro- rapidly builds in the system forcing <br /> I <br /> \\ <br /> J <br /> Position 1 Position 2 <br /> j Position 3 <br /> . ,t Vented Vented vented <br /> to Tank to Tank I to Tank <br /> Pressure Relief <br /> Valve 20.22 PSI <br /> i <br /> Lessthan <br /> 1 PSI <br /> i moi' <br /> � I <br /> Full Pressure Full Pressure \ r Full Pressure <br /> Poppet Approx.25 PSI Approx.25 PSI Approx.25 PSI <br /> from Pump \ 4—from Pump 4—from Pump <br /> \ \ <br /> Metering Pin \ <br /> \ Le PSlan \ 20 to 22 PSI l \\\ \ All Pressure \ <br /> Equal <br /> IT.Discharge Line STo Discharge Line .�To Discharge Line <br /> 1.The Trip or Relaxed Position. Under nor- 2. Leak Sensing Position. As the pressure dicated by the PLD taking longer than <br /> mal operating conditions, it is assumed builds to approximately 20 to 22 psi,* two seconds to open completely. If <br /> that the lines are filled with gasoline. (rapidly), the piston has moved the pop- there is no leakage in the system, the <br /> When the system pressure is less than pet to such a position as to almost stop small flow around the metering pin in- <br /> 1 psi, the piston and poppet are in their the flow into the piping through the PLD creases the line pressure to 22 psi in <br /> "down" or "tripped" position. The posi- valve poppet. In this position, all the approximately two seconds at which <br /> tion of the valve poppet is such as to flow must then travel around the meter- point the piston will snap the poppet to <br /> allow approximately 11/2 to 3 GPM flow ing pin which limits it to approximately Position 3, allowing full flow. Any prod- <br /> into the delivery line through a bypass 3 GPH rate. If a simultaneous loss from uct relieved through pressure relief <br /> opening in the PLD valve poppet when the system equals or exceeds this valve during trip position will be vented <br /> the submersible pump starts. Since the amount, the line pressure will not build through vent tube to tank. This allows <br /> system is full, pressure builds rapidly beyond this point and the valve will re- piston to move freely with no back <br /> and the poppet moves to the leak sens• main in the leak sensing position with pressure to hamper its movement. <br /> ing pcoition assuming there is no leak the main flow blocked. If there is an at- 3. Non-Leak Position. This position allows <br /> present. The pressure relief valve pre- tempt to dispense while the valve is in full flow. The poppet will remain in this <br /> vents any build up of pressure under this position, the line pressure will drop, position as long as the system pressure <br /> piston when in trip position by allowing the piston will respond, and the poppet remains above 1 psi. At less than 1 psi, <br /> relief of trapped product. will return to Position 1 where the 11/2 the poppet will return to Position 1 and <br /> to 3 GPM will flow to the dispensers. the next time the pump is activated, the <br /> Leaks smaller than 3 GPH will be in- PLD will perform a line test. <br /> 'FOR FLD TO OPERATE PROPERLY, <br /> SUBMERSIBLE PUMPING UNIT MUST <br /> BE ABLE TO PRODUCE A MINIMUM OF <br /> 22 PSI. 0 <br /> RED JACKET' <br /> PUMPS <br /> A Wle,'Purtp 7_� <br /> 5600 F-fidpo b.,M-i KS 66202,(913)722 1AM <br /> RJ-3? <br />