Laserfiche WebLink
Sacramento Equipment vicsintenance Company, Znc.-2533 Connie Drive-Sacramento acramento - Ca. 9585 <br /> �� Work Order #,�-// � <br /> 1a. cr�� Station # s`--"— <br /> Nanta of Suop)ler,owner e,Dere, Date — <br /> Adaren,No.one 8/reat(f) City " <br /> Stab Date of Taft <br /> g 15. TANK TO TEST 16. CAPACITY <br /> yFrom <br /> y ' ^ / BY most accurate Station Chart <br /> Nominal Capacity �� :> <br /> AO Itlanilty by DoeiUon , capacity than available C1 1 iC �J ❑ Tank Manufacturers Chart <br /> Geuone <br /> .J..t � G.Ilona <br /> Is there doubt as to True Capacity 7 ❑ ❑ Company Engineering Data <br /> .raF er.ntl end Graae See Section"DETERMINING TANK CAPACITY" ❑ Charts supplied withf0 TI}! <br /> 6/ 1�'s71c— <br /> ❑ Other <br /> 17. FILL-UP FOR TEST <br /> Stick Readings Total Gallons <br /> Stick Water Bottom to K In. Gdlom ea.Reeding <br /> before Fill-up J� .. J� <br /> to%In. Gallons Inventory _ c/ A 'J�r <br /> Fig up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED.DELIVERY.QUANTITY /"C�``JI <br /> Tank Diameter, q y <br /> --I O o / Product In full tants(up to fill pipe) <br /> Cl)c03 0 0 • 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK O -'S.T/��';'f% 77 0 <br /> A x N ,�� VAPOR RECOVERY SYSTEM <br /> 1 p O j Sae manual sections applicable.Check below and record procedure in I Orr�"6�'� Y S 9 d <br /> erg(26), e <br /> o D o D ❑ Weser In tank ❑ High water table In tank excavation ❑ 4)being�" �LVLLTr,/ _ S G ,y 11 Stage I <br /> om <br /> O ®Stage II <br /> N <br /> N 19. TANK MEASUREMENTS FOR 21. TEMPERATURE/VOLUME FACTOR(a)TO TEST THIS TANK <br /> TSTT ASSEMBLY Is Today warmer[j Colder?a_•F <br /> Bottom 01 tank to GradeProduct in Tank_•F Fill-up Product on Truck F <br /> /y 2 Expected Change(+or-) <br /> rp ". <br /> Add 30"for P L ................. . '� „ 22• Thermal-Sensor reading after circulation '7'L' F <br /> Add 24"for 3"L or air seal....... ins Nearer <br /> Total tubing to assemble Approximate /7 Z <br /> " 23. Digits per IF In range of expected change_ <br /> 20. EXTENSION HOSE SETTING 24. 9 51Tanx .noo J �j(`�p = G,O°2£tG / <br /> Extend <br /> top to grade-......... „ total quantity in eoeHielent of expansion For volume change in this tank 9allona <br /> full tank(16 or 17) Involved product <br /> Extend late on suction tube e"or more PN.F <br /> below tank by �_' 25. �, ,0 a!(p/ _ <br /> If Fill pipe extends above grede,use top of fig. volume change per,•F(24) Digits / This Is <br /> per'F In test Volume change per digit tent <br /> 26. - Range(23) Compute to 0 decimal places. factor(a) <br /> LOG OF TEST PROCEDURES 30. HYDROSTATIC 31. <br /> PRESSURE t'OIUMF MEASURFMENI$M 34' 38.NET VOLUME 39. <br /> CONTROL RECORD TO.MI GAL ffgPFRATUAE COMPENSATION ACCUMULATED <br /> USE FACTOR(a) CHANGES <br /> 27. 28. EACH READING CHANGE <br /> aD[ 29. Sundpipe Leval <br /> Record details of setting up ,does, ie Was. 32• hod.n is hed.a 35. 36. 37. Temparalro At RIP Incl record <br /> and running test.(Use full Gndeau Replaced(-) Change compubeoa Adiunman Tatr Eae sen.cs. <br /> ngn: length of line if needed.) eaainniep Lintel b Thereat Higher+ (c)x(a) <br /> of hick Saaer law.- Espimmos+ Volume Minus <br /> 121 k.) eefre Att., ►rodeo Reading a Eepanslon(+)r At Lw Ire cos a r" <br /> Reding Rutrd Reeding Road.., RecnerN(+) O Coetndiea- Contraction(-) Wage so,Her <br /> #33(V)-#37(7) WFA wNoris) <br /> r 7,4( ys) .s� �rTl 1 <br /> L <br /> 2 �l <br /> V/-, C c/ <br /> + + U <br /> l 'T <br /> C/ r z(7 4 <br /> 415,7 it c— 4, c <br /> /��. / / 9 c oo f 22 L ► -+ • Zo <br /> Yr Z r ;c <br /> Iff o7 rr, <br /> J, s z f f o - <br /> 1L.1 Z <br /> ,, <br /> *03/ <br /> rrGif <br />