Laserfiche WebLink
14. <br /> Name of Supplier,Owner or Dealer Address No.and Street(s) City State Date of Test <br /> D 15. TANK TO TEST 16. CAPACITY From <br /> Station Chart <br /> 71 /.� nL / Z _ ) D o O t1 By most accurate 1 (1 I1xTan <br /> f I, ) (/ Tank Manufacturer's Chart <br /> M W� Nominal Capacity capacity chart available <br /> 11 <br /> OIdentity by position Gallons Gallons [ J Company Engineering Data <br /> M� Is there doubt as to True Capacity? Charts supplied with Petro TItP <br /> _ tAN✓I[SIFc <br /> lees Brand and Grade See Section"'DETERMINING TANK CAPACITY" � � Other <br /> 11. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to r/a in. Gallons ea.Reading <br /> Stick Water Bottom 1042. q <br /> before Fill-up Inventory to W in. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> _ ►us �N6s Z l <br /> Tank Diameter 1,J Product in full tank(up to fill pipe) <br /> � -� 08 <br /> c m '� vim• `ate-�1Z• — o VAPOR RECOVERY SYSTEM <br /> Q 0 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br /> g See manual sections applicable.Check below and record procedure in log(26). Stage I <br /> 72 <br /> Water in tank High water table in tank excavation I Line(s)being tested with LV LLT Stage 11 <br /> D m C CIO . � R. S�},Z✓ <br /> 0 <br /> c 21. TEMPERATURENOLUME FACTOR (a) TO TEST THIS TANK <br /> rro 19. TANK MEASUREMENTS FOR Is Today Warmer's Colder' F Product in Tank I Fill up Product on Truck_- F Expected Change( * or ) <br /> call TSTT ASSEMBLY 3 <br /> IR Bottom of tank to Grade' . .................. 22. Thermal-Sensor reading after circulation I V7 C/J-4 7q/910 �F <br /> Add 30"for 4"L ................. _" cl Its Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per"F in range of expected change_ 3 f <br /> digits <br /> Total tubing to assemble Approximate " <br /> 20. EXTENSION HOSE SETTING p 3/ 24' — ( U `4 X e U U5 i3 —--- r gallons <br /> 0 total quantity in coefficient of expansion for volume change in this tanTank top to grade-. .... full tank(16 or 17) involved product per`F Oct <br /> Extend hose on suction tube 6"or Inure y/� 2 /`� }�q( S/.�1 <br /> below tank top ........... ...... ... -- -- 25. v � " - J 1 _ `� V V This is <br /> volume change per"F(24) Digits per F in test Volume change per digit. test <br /> 'If Fill pipe extends above grade,use top of fill Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> VOLUME MEASUREMENTS(V) TEMPERATURE COMPENSATION ACCUMULATED <br /> CONTROL EACH READING <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO.001 GAL. USE FACTOR(a) CHANGES CHANGE <br /> 21. 28. 29. Standpipe Level 32. 35. 36. 31. Temperature At High Level record <br /> in Inches Product in Product Change Computation Adjustment Total EM Deflection <br /> WE Record details of setting up Reading _ Graduate Replaced(-) Thermal Higher+ (c) x (a)= Volume Minus <br /> and running test.(Use full No. Beginning Level to -- - Sensor Lower- Es ansion+ At Low Level compute <br /> length of line if needed.) ° ° n Expansion(+)or <br /> TIME of which Before After Product Reading (c) Contraction - Contraction(-) Change per Neer <br /> (24 Ar) Reading Restored Reding Reading Recovered ♦33(V)-N37(T) (NFPA criteria) <br /> 0(030 QfL t l!E S cr e— _ 1 — - <br /> oW5? ASSE n bLrz_ G e A e. -- aY4�rat,,> - — --- <br />