My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
REMOVAL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2019 2:23:34 PM
Creation date
4/26/2019 2:15:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t •M A MAR 17 '99 09:577 PETROU ENGINEERING 70754 7E�h9_e9 9 Sc. p . KF`S <br />} <br /> Font Bios}stems <br /> March 10, 1989 <br /> Job No. lOaS-T-5 <br /> Conoco Inc. <br /> 900 S. Cherokee Lane <br /> Lodi , California 95240 <br /> Attention: Ms. Joyce Miley <br /> SubJect : Soil Sampling During Tank Full <br /> Fast Gas Station <br /> 800 East Highway 12 t <br /> Lodi , California <br /> a <br /> Dear Me. Mileys <br /> This letter describes the proposed soil sampling `~.r <br /> the scheduled tank pull for the Fast Gas 5' �n <br /> located at 800 East Highway 1,: in Lord , %�aliic: <br /> A representative from Du Font Eiasymtemz will . a <br /> on-site during the tank pull to observe the tanks <br /> for signs of possible leakage and collect samples <br /> of the soils underlying the tanks for chemical <br /> analyzes. The condition of each will be observed <br /> after the tank is removed from the pit and places <br /> on the ground surtaos. <br /> Two soil samples will be collected from balow ea,�-n <br /> tank excavated. Samples will be retained in pre- <br /> waashed 2 1/2-inch X t5- inch grass tubes, isbeled, <br /> covered with aluminum toil , capped with polyetn,,� lene <br /> lids, sealed with adhesive tape, and pla'^ed on ice. <br /> The sAmples will be delivered to Trace Analysis Lain- <br /> oratory la Cslffornia certified laboratory-) in Hayward, <br /> California and analyzed for total petroleum h/cIro- <br /> oarbons as gasoline, benzene, ethy1belnzene, toluene, <br /> and xylenes. The results or the soil Chemical analyses <br /> along with the chain-of-custody records will boa <br /> included in a summary report following receipt or the <br /> chemical analytical results. <br /> Respeotfully, <br /> DU p 114T '8' IOSYSTE.N$ <br /> George Reid <br /> Certified Engineering Geologist <br /> t. <br /> l <br /> W <br /> 7068 Koll Center Parkway, Sulte 401 + Pleasanton, Caiifornla 94566 ■ 415■462■7772 800■468■2122 + FAX ■ 415 462■7944 <br /> 500 W. Duttoe's MIII Road, Suite 102 ■ Aston, Pernsylvanla 19014 ■ 215■a97,5800 $00.548■ ;86a <br /> T <br />
The URL can be used to link to this page
Your browser does not support the video tag.