Laserfiche WebLink
`-UST SYSTEM PRINTSET INFORMATION <br /> 1• � Four complete sets of plans (To include s <br /> / pecification sheets and/or equipment brochures if not on file). <br /> 2. ✓ Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location and <br /> number of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5. Detail of too <br /> piping system, <br /> 6. <br /> Tank(s) and piping approved by a nationally recognized independent testi <br /> / ng organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) & 26351 <br /> 7. V Verification of product compatibility with the tanks) pi in <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)r]ranitoring <br /> 8• Manufacturer's written installation instructions for <br /> Mie), piping, monitoring devices, etc. [Section 2635 (b) (5)l <br /> 9. Tightness Test (NFPA 30) is required on bothrimar <br /> (Section 2635 (b) (6) & (7)] p Y (10) and secondary (20) containment systems before covering. <br /> 10. Double walled tanks using ply orvacuum testin to monitor the amular space. [Section 2635 (b) (7)] <br /> 11. V NFPA 329 "Precision Test" required upon completion <br /> from thestiof installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD quir <br /> COnY or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # <br /> CAPACITY <br /> MANUFACTURER <br /> COMPOSITION <br /> MODEL <br /> PRODUCT <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> 0� A. Steel-clad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)) <br /> N` C. Fiberglass (Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> D. Non-clad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />