My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
INSTALL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 4:58:51 PM
Creation date
4/26/2019 2:34:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Free from excessive mud and debris <br /> C. Location of Utilities and Service <br /> 1 . 24 hours before underground work begins , call USA <br /> Locating Service at 800-624-2444 . <br /> 2 . Consider the location of high voltage or overhead <br /> lines before crane or backhoe work . <br /> 3. Locate sanitary facilities , water , power , etc . with <br /> safety and convenience in mind. <br /> II . Schedule Work for Safety <br /> A. Have Safety Materials on Job When Needed <br /> 1 . Hard hats <br /> 2 . Safety goggles <br /> 3. Safety belts and harnesses <br /> B . Avoid Over-scheduling For Space on Lot <br /> 1 . Supervise traffic on lot . <br /> 2 . Provide traffic control for trucks entering or <br /> exiting job locations . <br /> III . Work Procedures <br /> A . Materials Handling <br /> 1 . Methods of loading, unloading and moving <br /> a. Adequate space <br /> b . Proper auxiliary equipment-- Cranes <br /> * Rigging <br /> * Hand trucks <br /> * Fork lifts <br /> * Backhoes <br /> B . Tools and Equipment <br /> 1 . Repair , maintenance and care <br /> 2 . Description prior to use of electrical or <br /> mechanical tools <br /> Page - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.