My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
INSTALL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 4:58:51 PM
Creation date
4/26/2019 2:34:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complex Problem , 10 ,01' <br /> Spills and overfills are a frequent cause of As a petroleum marketer,you face the <br /> release from petroleum underground challenge of upgrading all of your existing <br /> storage tank(UST) systems. New federal UST systems to meet the new requirements <br /> regulations are now in effect that establish for spill and overfill prevention within <br /> new technical standards and corrective the next ten years. Plus, all of your new <br /> actions for owners and operators of UST installations must meet these <br /> petroleum USTs. requirements....now. <br /> This is the problem. <br /> Sime olution• <br /> We have a simple solution. <br /> The OPW 61-SOTM overfill prevention <br /> valve combined with the OPW 1TM spill <br /> container creates a simple, flexible,cost- <br /> effective system that meets federal <br /> technical requirements for overfill <br /> prevention and spill containment n <br /> equipment. <br /> The OPW 1 Spill Container installs directly on the riser pipe <br /> just above the 61-SO. It has a flexible bellows for adjustment to <br /> grade changes. It is designed for easy installation on new <br /> underground storage tanks, and can also be used in existing '' <br /> : 4 <br /> ii4stallations. The internal drain valve provides for high-speed <br /> draining and convenient tank testing.The aluminum lid is <br /> designed to resist water entry and provide easy access to the tank <br /> i connections. <br /> t <br /> The OPW 61-SO Overfill Prevention Valve provides delivery shut- <br /> off and allows the filling of the UST to 95% capacity per EPA i <br /> guidelines. It mounts directly in the riser pipe for easy installation <br /> in existing and new operations without requiring additional <br /> excavation. <br /> .:For more information on the OPW solution to federal regulations <br /> on overfill prevention and spill containment, call us toll-free and <br /> request our free brochure, The System Solution To Your UST �. <br /> Needs or contact your local OPW Distributor. <br /> 1=800-422-2525 <br /> eY <br /> Fueling Components Group j <br /> _= P.O. Box 405003 • Cincinnati, Ohio 45240-5003 <br /> Telephone(513)870-3219 or <br /> 1-800-422-2525 ' <br /> The OPW 61-SO is a Trademark for OPW Overfill Prevention Valves. <br /> The OPW 1 Is a Trademark for OPW Spill Containers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.