My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
REMOVAL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2019 4:19:25 PM
Creation date
4/26/2019 3:57:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH & SAFETY PLAN <br /> 1. 0 INTRODUCTION <br /> A. OVERVIEW <br /> This Project Health & Safety Plan delineates the basic <br /> safety requirements for this project. <br /> This project includes the scope of work for removal <br /> and/or installation as described on the cover sheet of <br /> this Project Health & Safety Plan. During the piping <br /> removal project, soils from beneath the piping will be <br /> sampled for possible contamination. The soil samples <br /> will be collected and analyzed for the possible presence <br /> of migrating contaminants, including: TFHC (Total Fuel <br /> Hydrocarbons) and BTX Compounds (Benzene, Toluene, and <br /> Xylenes) . <br /> At the beginning of the project, ambient air samples <br /> (background) will be taken with a Gastech LEL meter, set <br /> for reading ppm range, to determine the presence or <br /> absence of contamination. As the project continues <br /> during the day, the personnel on site shall draw <br /> periodic air samples to determine the possibility of <br /> increases in airborne contamination. <br /> The provisions set forth in this plan will apply as <br /> minimum rules to be followed by the employees of Walton <br /> Engineering, Inc. , the Environmental Consultant Company <br /> (listed on the cover sheet of this Project Health & <br /> Safety Plan, and herein referred to as "Environmental <br /> Consultant") and their subcontractors working on this <br /> phase of the project. The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase <br /> the safety requirements, and only with the concurrence <br /> of Walton Engineering, Inc. . <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.