Laserfiche WebLink
SWRCB,January 2002 Page 2- <br /> 9. --ILL/OVERFILL CONTAINMENTIXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: ❑ Pressure Vacuum �x Hydrostatic <br /> ❑ Other(Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 2-UNLEAD 2-8 7 Spill Box# 3-PLUS 3-8 9 Spill Box# Spill Box# <br /> Bucket Diameter: 1311 1311 <br /> Bucket Depth: 1311 13 If <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. <br /> starting test: <br /> Test Start Time: 2 :4 0 2 :4 0 <br /> Initial Reading(Ri ): 11" 11" <br /> Test End Time: 3 :4 0 3 :4 0 <br /> Final Reading(RF ): <br /> 11" 11" <br /> Test Duration: 60 MIN. 60 MIN. <br /> Change in Reading(R p-RI ) <br /> 0" 0" <br /> Pass/Fail Threshold or PASS PASS <br /> Criteria: <br /> NA <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> RETESTING 87 GRADE SPILL BUCKET, AND 89-GRADE SPILL BUCKET ONLY. " PHILL TITE SPILL <br /> BUCKET'S ON SITE. " <br />