Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: ❑UDC Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Barrett hydrostatic sump tester Equipment Resolution: <.002gph <br /> UDC#7/8 UDC# UDC# UDC# <br /> UDC Manufacturer: Bravo Box <br /> UDC Material: Steel <br /> UDC Depth: 6" <br /> Height from UDC Bottom to Top NA <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to NA <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Penetration Leak <br /> testing: <br /> Portion of UDC Tested 2"off bottom <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown?' <br /> Was fail-safe verified to be ❑Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> o rational?' <br /> Wait time between applying 10 min <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 3:00 <br /> Initial Reading(Rj): 250ml <br /> Test End Time: 3:20 <br /> Final Reading(RF): 248m1 <br /> Test Duration: 17.8min <br /> Change in Reading(RF-Rj): 2ml <br /> Pass/Fail Threshold or Criteria: <.002gph <br /> Test Result: X Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testis ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Vapor oenatration was resealed to bottom of bravo box and tested 2" from bottom <br /> With passinia results <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />