Laserfiche WebLink
SWRCB, January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: X Sump Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Barrett Hydrostatic Sump tester Equipment Resolution:<.002 Gph <br /> Sump#1 Regular Sump#2 Plus Sump#3 Super Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 48" 48" 48" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14" 16" 22" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 15" 22" 25" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Penetration Leaks Penetration Leaks Penetration Leaks <br /> Portion of Sump Tested' 17" 24" 27" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?' <br /> Turbine shutdown response time 5sec 5sec 5sec <br /> Is system programmed for fail-safe ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No [INA <br /> shutdown? <br /> Was fail-safe verified to be ❑Yes X No ❑NA ❑Yes X No ❑NA ❑Yes X No ❑NA ❑Yes ❑No ❑NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min 15min 15min <br /> test: <br /> Test Start Time: 9:OOam 1:OOpm 2:30 <br /> Initial Reading(RI): 850ml 690ml 800ml <br /> Test End Time: 9:23 1:22 2:55 <br /> Final Reading(RF): 840ml 685ml 780ml <br /> Test Duration: 22.9min 19.8min 22.5min <br /> Change in Reading(RF-R4): 10ML 5ML 20ML <br /> Pass/Fail Threshold or Criteria: <.002GPH <.002GPH <.002GPH <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> Maintance repairs were preformed to all 3 Turbin sumps and disp7/8 <br /> Entero boots for product /vapor and electrical were resealed to sump walls <br /> Test was ran with water 2" above highest oenatration with passing results <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />