Laserfiche WebLink
SWRCB,January 2002 Page 2 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F—] Spill Bucket Manufacturer Industry Standard F] Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure Vacuum Fx—] Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> ME Spill Box# 91 Spill Box# 87 Spill Box# 89 Spill Box# <br /> Bucket Diameter: 1 11 11 11 <br /> Bucket Depth: 12 12 12 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1100 1100 1100 <br /> InitialReading(Ri 11 11 11 <br /> Test End Time: 1200 1200 1200 <br /> Final Reading(RF ): 11 10 10 <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(R F-1;4 ) 0 1 1 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: Pass E Fail E]Pass [T] Fail Pass M Fail Pass D Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-tip for failed tests) <br /> CALLED IN TO MAINT FOR REPAIRS <br />