Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> c SAN JOAQUIN COUNTY <br /> Donna K. Heran, R.E.H.S. Unit Supervisors <br /> N: < Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> Al Olsen, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> Douglas W.Wilson,R.E.H.S. <br /> Program Manager Telephone: (209)468-3420 <br /> 4 F O R Laurie A. Cotulla, R.E.H.S. Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Jeff Carruesco,R.E.H.S. <br /> July 14, 2005 <br /> USA Petroleum Corporation <br /> Attn: Sandy Edwards <br /> 905 Rancho Conejo Blvd. <br /> Newbury Park, CA 91320 <br /> Re: USA Station#3696 <br /> 2448 W. Kettleman Lane, Lodi CA <br /> The permit application to investigate the cause of secondary containment testing failure <br /> has been approved with the following conditions: <br /> 1. A complete description of work performed must be submitted prior to scheduling <br /> the final inspection. <br /> 2. If any piping is to be repaired or replaced Environmental Health Department <br /> (EHD) must be notified so that an inspection can be arranged and parts can be <br /> approved prior to commencing work. Per Environmental Health assessment of <br /> findings, new plans and a permit application may be required to be submitted. <br /> 3. Soil sampling may be necessary per Environmental Health assessment. <br /> 4. A line integrity test on the primary piping of all exposed lines must be performed <br /> by a certified technician and results received by this office prior to the final <br /> inspection. <br /> 5. If concrete is broken near the underground storage tank a tank integrity test must <br /> be performed by a certified tank tester prior to the final inspection. <br /> 6. A 24-hour lake test will be required on any sumps that require repair/replacement. <br /> 7. EHD must witness a 30-minute pressure test on all repaired/replaced piping prior <br /> to backfill. <br /> 8. There must be at least one individual on site that possess an ICC technician <br /> certification at all times that work is being performed. <br /> 9. Arrange a final inspection with this office prior to returning this station into full <br /> service. Give 48 hour notice for all inspection appointments. <br /> If you have any questions,please call Dennis Catanyag, REHS at (209) 468-3459. <br /> Thank you, <br /> enm atan g, S <br /> Registered Environmental Health Specialist <br />