Laserfiche WebLink
APR-30-2008 10:08 Service Station Systems 408 938 8888 P.04 <br /> 4, FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specrfy) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: lncon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Sump#87 <br /> Sump Diameter: 44" ! <br /> Sump Depth: 68" <br /> Height from Tank Top to Top of N/A I <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 20" <br /> Electrical Penetration: E <br /> Condition of sump prior to Good <br /> testing: <br /> Portion of Sum Tested 2"above piping <br /> Sump Material: iriberolass <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes <br /> starting test: <br /> Test Start Time: 12:35 pm <br /> Initial Reading(R,): 4.7385 <br /> Test End Time: 12:50 pm <br /> Final Reading(Rr,): 4.7390 <br /> Test Duration: 15 min. <br /> Chane in Readin (RF-Rj): +0.0005 <br /> Pass/Fail Threshold or Criteria: +/-0.002" <br /> Test Result: o Pass Fail <br /> Is there a sensor in the sump? ® Yes [I No <br /> Does the sensor alarm when <br /> either product or water is ❑ Yes ❑No 0 NA <br /> detected? <br /> Was sensor removed for testing? 0 Yes []No ❑NA <br /> Was sensor properly replaced and ' <br /> ®Yes ❑No L]NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recornnmended follow-ue forfailed testa) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> Installed boot <br /> TOTAL P.04 <br />