My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:31:54 AM
Creation date
4/29/2019 9:19:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB-20-2008 09:03 Service Station Systems 408 938 8888 P.05 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> Piping Ran#87 Piping Run#89 Piping Run#91 <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith v <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 105' 115' 125' <br /> Product Stored: Gasoline Gasoline Gasoline <br /> Method and location of <br /> Reducer Boots/Flttings Reducer Bouls/P'ittint;N Reducer Boit%(Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time- 7:45 am 7:45 am 9:00 am <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 8:45 am 8:45 am 10:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. I hr. <br /> Change in Reading(Rr Rj): none none none <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detectable Lass <br /> Criteria: <br /> Test Result: I ® Pass Fail I ®Pass Fail ©Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended,follow-up.forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.