Laserfiche WebLink
FEB-20-2008 09:03 Service Station Systems 408 938 8888 P.05 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> Piping Ran#87 Piping Run#89 Piping Run#91 <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith v <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 105' 115' 125' <br /> Product Stored: Gasoline Gasoline Gasoline <br /> Method and location of <br /> Reducer Boots/Flttings Reducer Bouls/P'ittint;N Reducer Boit%(Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time- 7:45 am 7:45 am 9:00 am <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 8:45 am 8:45 am 10:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. I hr. <br /> Change in Reading(Rr Rj): none none none <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detectable Lass <br /> Criteria: <br /> Test Result: I ® Pass Fail I ®Pass Fail ©Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended,follow-up.forfailed tests) <br />