Laserfiche WebLink
SEP-17-2007 10: 11 Service Station Systems 408 938 8888 P. 11 <br /> • Monitoring System Certilication-Pigt f3 <br /> glalo7 <br /> Site Address: 2448 W. Kettleman Ln. @ Lower Sacramento Date of Testing/Servicing: <br /> F. In - Tank Cauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> 0 Yes 0 Nov Has all input wiring been inspected for proper entry and termination, including;testing for ground faults'? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of System product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested'? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): I] Check this box if LLD's are not installed. <br /> ComUkfe the following checklist: <br /> es ❑ No* For equipment start-up or annual equipment certtion was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all Mal apply) Simulated Irak reale:P,' g.p.h. (1.); ❑ 0.I �.�.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br /> Yc, b No* Were all LLD's confirmed operational and accurate within regulatory requirements. <br /> e ❑ No* Was the testing apparatUIS properly calibrated? <br /> es [I No* For mechanical LLD's,does the I.i.D restrict product flow if it detects a]eak`? <br /> ❑ N/A <br /> ❑ Yes ❑ For electronic LLD's, docs the turbine automatically shut off if the LLD detects a leak? <br /> ar"N/A <br /> ❑ Yes ❑ For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> EKNIA or disconnected? <br /> ❑ Yes ❑ No*. For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> a-jl/�A malfunctions or fails a test? <br /> C3 Yes N9.% For electronic LLD's,have all accessible wiring connections been visually inspected'? <br /> /A <br /> es l7 No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: l� � _/t <br /> TOTAL P. 11 <br />