Laserfiche WebLink
SAN JOAQ4PCOUNTY ENVIRONMENTAL HEALTEWARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION E31.NEW PLAN 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE -W MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mot. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME tj S A 8 i.5 3 Moa. <br /> FACILITY SITE ADDRESS a Ll y 8 W KQ 11 I e` A,-\ 4_0 Moa CITY Jed Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annual whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED vl ANNUALLY ❑ 99.OTHER(Specify): M07. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: 14;� a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MI1. <br /> PANEL MANUFACTURER: i bt4rca M12. MODEL#: M C_ M13. <br /> LEAK SENSOR MANUFACTURER: I} kr' 00t M14. MODEL#(S): yD7 MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: MI6. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: m"- MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): M22. M23. <br /> g.p.h. g.p.h. ( P fY)� <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> ❑ <br /> 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ <br /> 99.OTHER(Specify): M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM 1"131 <br /> PANEL MANUFACTURER: 6 164r LO 1432. MODEL#: -R M C_ M33. <br /> LEAK SENSOR MANUFACTURER: I clzr M34. MODEL#(S): 19015 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? X a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? JLa.YES ❑ b.NO M37. <br /> MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED Q / <br /> MLLD MANUFACTURER(s): LI ft1T { R J A�K_e_� M38 MODEL#(S): `9 Q; 0000 F� IL-V M39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moo. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ S.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY" ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> •Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />