My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 3:44:53 PM
Creation date
4/29/2019 11:24:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - Pae 1 of 2 <br /> TYPE OF ACTION ❑ L NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY 400-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> BUSINESS NAME(Same as Facthry Name or DBA) USA/Tesoro 68153 <br /> BUSINESS SITE ADDRESS 2448 W. Kettleman Lane 103 �Crry Lodi 104 <br /> U. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annuals whichever is more frequent.Such work must be performed by qualified personnel[zl cca§2631,2634_.63s,zwi J <br /> MONITORING EQUIPMENT IS SERVICED C1L ANNUALLY ❑ 99.OTHER(Specify): 490-3 <br /> 490.36b <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 C1711§26.12,26141 490-4 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) y0-(Check l° <br /> I I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.(23 CCR§2612,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ® c.PRESSURIZED ❑ d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: Gllbarco 490.7 MODEL* EMC 490.8 <br /> _ <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9 MODEL#(Si: 794390-409 490-10 <br /> -0-2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§26431 460-(1 <br /> PANEL MANUFACTURER: 490.12 MODEL#: 4`/0'1i <br /> IN-TANK PROBE MANUFACTURER: 490.14 MODEL#(S): 4'"1-11 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DALLY/NIGHTLY ❑ c.WEEKLY 490.16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.13 <br /> PROGRAMMED TESTS: ❑ a.0.1$.p•h. ❑ b.0.2g.p.h ❑ Oeci 490.1 it <br /> ..---. _.._----------. ._._- gP c _-- (-THER SP,�Y)� 490--re _ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 ccit§two i 490.20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 ccR§26451 TESTIN_G PERIOD: ❑ a.36 HOURS ❑ b.60 HOUK� 490 <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 ccR§26431] 490-1-1 <br /> TEST FREQUENCY__ - ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): -4�4 0-24 <br /> 2 5 <br /> 490.26 <br /> ❑ <br /> 99.OTHER(Specify): 490.27 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) ((Ch-k-11 <br /> ® 1.CONTINUOUS MONITORING OF PIMPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28 <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a. Q <br /> DRY ❑ b.LIQUID FILLED ® c.PRESSURIZED ❑ d.UNDER VACUUM 490.29 <br /> §2636) <br /> PANEL MANUFACTURER:Gilbarco 490-10 MODEL#: EMC 490-31 <br /> LEAK SENSOR MANUFACIUKEK: Veeder Root 490-32 MODEL.#(S) 794380-208 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMA I IC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490x4. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM__TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.11 <br /> I ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490:6 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§26361 <br /> MLLD MANUFACTURER(S):Vaporless 490-37 MODEL#(S): LD2000 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[13 CCR§16161 490 19 <br /> I ELLD MANUFACTURER(S): 490.40 MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42, <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 411-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 4904 <br /> ❑ 4.PIPE INTEGRITY TESTING. -_- - -- -------- 49iLJs <br /> TEST FREQUENCY: _ ❑ a.ANNUALLY C3 b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490�°7-'t6 <br /> ❑ 5.VISUAL PIPE MONITORING a�=48 <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. 490.49 <br /> Mimed for monil onng ofunburied eme a- gmmtor Rid Qeing only per HSC§25281.1(6x3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERLA.[23 cca§2636(ax3)] 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51 <br /> 490.52 <br /> ❑ 99.0THER(Specify) 49n-s3 <br /> UPCF UST-D(12/2007)-117 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.