My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 1:14:28 PM
Creation date
4/29/2019 2:10:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6: APPLY GREASE TO DROP TUBE <br />Apply black moly grease to the inside diameter of the <br />upper drop tube. Make sure coverage is completely <br />around the tube as shown in Figure 6. <br />Figure 6 <br />STEP 7: APPLY GREASETO POLYPAK SEAL <br />Ensure that the polypak seal is installed on the inlet <br />tube with the lip up as shown in Figure 7. Apply black <br />moly grease to the polypak as shown. Make sure cover- <br />age is completely around the polypak seal. <br />Ensure polypak <br />lip is up <br />i , <br />Inlet � LJ <br />Tube �,1 roty�k <br />- <br />�,��''—Apply grease <br />around polypak <br />Figure 7 <br />STEP 8: INSTALL INLETTUBE <br />Insert the inlet tube into the upper tube until the upper <br />tube seats against the fl <br />ange on the inlet tube. Ensure <br />polypak is inserted evenly and stays in inlet tube <br />groove. <br />Figure 8 <br />NOTE: Testable inlet tube must have cable port in <br />linewith float. Testable inlet tube bottoms out on <br />stoP1 it does not bottom out on inlet flange. See Fig- <br />ure SA <br />Cable port must be in <br />line with float <br />'figure 8A <br />astable Models Only <br />SEE PAGE 8 FOR INSTRUCTIONS USING THE 71 SO - <br />TOOL. <br />SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOLC. <br />SEE PAGE 10 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOLCT. <br />Note: testable 71 SO models ending with a "T" require the <br />71 SO-TOOLCT or modified 71 S0 -TOOL or 71 SO- TOOLC <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.