Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EJAY 31 2016 <br />1. Site map enclosed? YES NO [X ] :.. . t..: . <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Replace the 87 and 91 vapor and fill spill containers with new style Phil-tite 5 gallon spill containers. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -parry approval): <br />Phil-Tite 85100-1 Fill SC, Phil-TIte 85101-1 Vapor SC <br />3 <br />