Laserfiche WebLink
Mr. Don Mukai - 3 - January 23, 2013 <br />7 Per CCR, § 2636(f)(1) the UDC must be equipped with a continuous monitoring <br />system that either activates an audible and visual alarm or stops the flow of <br />product at the dispenser when it detects a leak. The placement of the under <br />dispenser spill control or containment systems shall not interfere with the <br />continuous monitoring system. <br />8. The CONV-B2000 shall not interfere with the capability to conduct any required <br />secondary containment testing of the UDC or the maintenance of leak detection <br />equipment. <br />9. Per CCR, § 2636(g)(3)(C), the Underground Storage Tank Program Manager <br />may modify or revoke this approval, at any time, if there is any evidence that <br />CONV-B2000 fails to adequately protect the soil and groundwater from <br />unauthorized releases. <br />10. Each frame is only considered to be approved as long as it is manufactured, <br />installed, retrofitted, operated, and maintained in accordance with Bravo's <br />requirements and the State Water Board's regulations. <br />11 The State Water Board has not reviewed the ability of the CONV-B2000 to <br />adequately anchor the dispenser to the surrounding concrete. This approval in <br />no way relieves the manufacturer or qualified individual from responsibility for <br />ensuring that the dispenser is properly secured in accordance with applicable <br />codes, regulations, and sound engineering practice. <br />12 This approval is based solely on UST statutes and regulations and does not take <br />into account other codes that may apply (i.e., fire code, building code, etc.)_ <br />Description of the CONV Retrofit Plate Kit <br />The CONY Retrofit Plate Kit is necessary when existing conduit prevents the CONV- <br />B2000 from being installed per the manufacturer's specified installation instructions. <br />The kit is comprised of a pre -abraded fiber reinforced plastic plate, Bravo adhesive - <br />epoxy, the necessary tools to apply the adhesive -epoxy and site specific installation <br />instructions. The kits are specific to the impediment and therefore the fiber reinforced <br />plastic plate provided is sized accordingly. The fiber reinforce plastic plate is modified <br />on site in a manner to cover any portions of the CONY -82000 that had to be removed to <br />accommodate installation When installed properly, any release within the dispenser <br />would be directed to the UDC without the possibility of the release escaping to the <br />environment due to protrusions through the conversion frame. <br />Review Process of the CONV Retrofit Plate Kit <br />Pursuant to California Code of Regulations (CCR), Title 23, § 2636(g)(3), we have <br />reviewed the application to determine whether the system adequately protects the soil <br />and beneficial uses of groundwater. During the review process the State Water Board <br />received and reviewed the following documents: Bravo CONY Retrofit Plaa+� <br />Control of the CONV Retrofit Plate, Installation Manual for a Bravo CONV >(f- <br />NOV 2 4 2014 <br />ENVIRONMENTAL HEALTH <br />0EPARTMENT <br />