Laserfiche WebLink
NEW UST )TALLATION INSPECTION REC ID <br /> --4(�l <br /> FACILITY MANE: J & L Market ADORESs: £3115 S . El Dorado St . French Camp <br /> S%JL_EPS: TAMKt uLl U l-1 7 4 6 TANK MCOEL/MATERIAL:modern <br /> 'ITY: (1) 12000 ( ) 6 00 PRraJCTunleaded Gas Pre . UNL GASE-H.S: <br /> Quuu 1 iesel <br /> A I <br /> P M \ ALL TANGS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I -- WITH MA)AJFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLAITS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROYEID U'.T!o'j S (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM." 1tk SOAP: PSI: HRS/MIN: BRINE(LIOUID AN)ULAR): OTHER: <br /> PRIMARY TANK TEST: PSI: HRS/MIM: <br /> nT`l r 5. TANK AFS•ROPRIATELY PLACED WITH APPROVED SAIXFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> 1 PIPING INSPECTIONS <br /> �l. C ✓ 6. PRIMARY PIPING TEST (MIMIFI M 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br /> t,Z/tj/Gj,S 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIM: OTHER: (CCR 2635 (A) (4)) <br /> i2C� <br /> - LAKE TEST ON ALL SLIMS (24 HR. MIMI") HRS: (CCR 2635 (A)) <br /> 9. UNUSED TANK OPENINGS SEALED Alm CORROSION PROTECTED (CCR 2635) <br /> V 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> (CA I <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> ft .� 2 ✓ 12. PERFORMANCE TEST FOR 'ALL" MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> v <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 7635 (B) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOC7C D AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> t 1 J C x- 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2.635 (A) (5)) <br /> 20- MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> z ' 21- 'C' FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 122- MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> Z ✓ Z3_ ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H-S CODE 25284 (E) (F)) <br /> COMENTS: <br /> EH23--006 3/92 (REVISED 11\92) <br /> g <br />