Laserfiche WebLink
i <br /> UST SYSTEM PRINTSET INFORMATION <br /> 1. X Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. _X Plans drawn to scale in non-erasable print. <br /> X <br /> �• Plot plan to show location and number of tanks. <br /> X <br /> 4• Tank cross-sectional diagram included on prints submitted. <br /> 5. X{ Detail of tank, piping system, excavation and cover. <br /> 6. X Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) b 26351 <br /> 7. X Verification of product compatibility with the tank(s), piping, monitoring <br /> X device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> S. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)) <br /> 9. _X Tightness Test (NFPA 30) is required on both primary (10) and secondary •(2°) containment systems before covering. <br /> X [Section 2635 (b) (6) b (7)J <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br /> 11. X NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # <br /> CAPACITY 112000 16000 16000 <br /> I <br /> MANUFACTURER modern modern 40dern <br /> Cr*DOSITION glasteel gasteel glasteel <br /> lasteelI lasteel] IglasteellI <br /> PRODUCT nl gas unl preg Js nese <br /> CORROSION PROTECTION fiber lasI fiber lags fiberglass <br /> U.L. LISTED I UL-1746 VL -1746 JUL71746 <br /> CCNPATIBILITY WITH 1001 <br /> METHANOL yes yes yes <br /> 13. TANK(s) TO BE INSTALLED <br /> XA. Steel-CLad with fiberglass reinforced plastic. <br /> X AT Factory <br /> B. Holiday test required immediately :afore "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br /> X C. Fiberglass [Sections 2635 (3) and 2631 (p)] see material spe . <br /> (1) Striker plate dimensions and materials. see material spec . <br /> X (2) Striker plate under all accessible openings. see material spec . <br /> NIA <br /> A (3) Installation instructions require an air test and soapbubble <br /> test prior to installation. <br /> N A 0, Non-clad steel tank (Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />