Laserfiche WebLink
PUBLIC HEALTH SERVICES <br /> z: <br /> ENVIRONMENTAL HEALTH DIVISION `° T <br /> (445 N SAN JOAQUIN STREET) <br /> P 0 BOX 388 <br /> P.O. BC STOCKTON CA 95201-0388 5201 <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Public Health Services-Environmental Health Division (PHS-EHD) has established the <br /> following guidelines to assist you in the completion of your construction project The guidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground storage <br /> tank (UST) system. <br /> 1. SUBMITTAL OF PLANS <br /> a. / Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental <br /> p' Health Division. Upon approval, one set will be retained by the department and the other <br /> two will be returned. <br /> b� 7Include equipment and material specification sheets and manufacturer's brochures describing <br /> operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> `t� Include detailed monitoring and response plans for facility. <br /> c;/ <br /> d The drawn to scale plot plan should illustrate the location of all existing and proposed <br /> structures, including existing UST(s). <br /> The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. PLAN REVTEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of S624.00 (8 hour minimum per facility), $170.00 fee per tank, <br /> plus S56.W state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of additional tank at an existing facility is 5624.00 pian review fee (8 hour <br /> minimum per facility) plus 5170.00 fee per new tank, and 556.00 per tank state surcharge fee. <br /> C. It should be noted that a 5624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of S78.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS/E. D within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date. <br /> A Dmmon of;an Jn2Q=Counry Holm r-ue bemccs CI <br />