Laserfiche WebLink
1. INTRODUCTION <br /> This Manual contains the operation, installation, interconnection, start-up, and <br /> maintenance instructions for the VCS 100 processor and Indicator Panel. Note, these <br /> instructions are written to give the best installation in a sequence easiest for the <br /> installer. If there are any instructions in this manual which seem impossible, impractical, <br /> or questionable for your installation, call the Hirt Customer Service Department at <br /> (562) 692-6970 and ask for information regarding your local Hirt representative. Note, <br /> this manual should be retained for future reference. <br /> 2. SAFETYIWARNINGS <br /> WARNING: Improper installation, adjustment, alteration, service or maintenance can <br /> cause property damage, injury, or death. Read instructions thoroughly before installing <br /> or servicing this equipment. <br /> WARNING: When gasoline vapor abatement system (i.e. processor) is in operation, <br /> temperature inside can exceed 2,000-F. To prevent burn hazard, do not contact any <br /> part of the gasoline vapor abatement system except controls. Do not remove protective <br /> covers while gasoline vapor abatement system is in operation. <br /> 3. CONTRACTOR REQUIREMENTS <br /> To prevent from voiding the product warranty, all contractors who install, startup, and/or <br /> repair the VCS 100 system must be a Hirt VCS 100 certified technician. To attend a <br /> VCS 100 training session, call Hirt Customer Service at (562) 692-6970 or send an <br /> email request to HirtVCS@aol.com. Once Hirt training is successfully completed, the <br /> technician will receive a wallet size proof of certification card. Technicians should carry <br /> the card while on the jobsite. Hirt maintains a list of active certified installers and <br /> companies. Technician certification can be verified by calling or emailing Hirt <br /> Combustion Engineers, Inc. <br /> Note to Contractors/Technicians: Contractors should always verify the training and <br /> certification requirements with the local Air Quality Management District (District) before <br /> beginning installation of CARB EVR systems. The District inspector may request to see <br /> your certification card(s) on-site for confirmation. <br /> Page 14-1 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />