My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
processor and whether or not the processor is operating properly. The panel <br /> includes a POWER switch with an integral POWER (green) lamp, a <br /> PROCESSING (green) lamp, and an OVERPRESSURE (red) lamp. <br /> During normal operation, the POWER switch is on, the POWER lamp is on, <br /> the PROCESSING lamp is lit intermittently, and the OVERPRESSURE lamp <br /> is extinguished. The PROCESSING lamp is wired so it will light when the <br /> main valve is open and thermal oxidation is occurring. <br /> The OVERPRESSURE lamp is wired to the vacuum sensor/switch and a <br /> timing module. If the UST pressure is positive for at least 1 hour, then the <br /> vacuum sensor/switch will be closed and the timing module will light the <br /> OVERPRESSURE lamp. The OVERPRESSURE lamp indicates a leak in the <br /> vapor recovery system or possibly a malfunction of the Hirt VCS 100 <br /> processor. The OVERPRESSURE lamp will extinguish after the leaks or <br /> processor malfunction is corrected and the processor has restored the UST <br /> ullage to a nominal —0.40" w.c. <br /> 4.4 Processor Dimensions, Weight, and Specifications <br /> 38" <br /> MODEL: VCS 100 <br /> SERVICE: Outdoor, non hazardous area <br /> ELECTRICAL: 120 VAC, 3 Ampere, intermittent <br /> VAPOR PIPE CONNECTION: 3/4@ NPT <br /> WEIGHT: 80 lbs. <br /> OVERALL DIMENSIONS: 18" wide X 18" deep x 38" high (without legs) <br /> Page 14-3 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />
The URL can be used to link to this page
Your browser does not support the video tag.