Laserfiche WebLink
Valve more open or closed until ideal flame setting is achieved. See <br /> FIGURE 11. <br /> SPARK <br /> PROBE / <br /> PILOT ROD PILOT BURNER <br /> NEEDLE <br /> /1 L \/E <br /> �o. <br /> 8.9 Installation and start-up are now complete. Turn off power to processor. <br /> Replace lid on electrical panel, Shell, and Weather Cover. If desired, the <br /> station owner can add padlocks to prevent tampering, see FIGURE 12 <br /> below. Ensure the 3/4" ball valve at the processor inlet is in the locked open <br /> position (Opened to UST Ullage). Turn on power to processor. The <br /> processor is now in normal, automatic mode. <br /> FIGURE 12 <br /> SHELL. <br /> `�PADLDICK <br /> 0 0 <br /> BASE f <br /> LEG <br /> Page 14-16 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />