Laserfiche WebLink
Page 1 of 1 <br /> Raymond von Flue [EH] <br /> From: Rebekah Butler[rebekah@ampetroleumec.com] <br /> Sent: Monday, March 23, 2009 8:32 AM <br /> To: Raymond von Flue[EH] <br /> Subject: J&L Market, 8115 S. EI Dorado St., French Camp, CA <br /> Ray von Flue, <br /> APEC's contractors will be performing the following duties: <br /> Installer(Level 1) Certification: Contractors holding valid Installer Certification are approved to <br /> perform wiring and conduit routing: equipment mounting: probe, sensor, and carbon canister vapor <br /> polisher installation; tank and line preparation; and line leak detector installation. <br /> HMC (Heath Allen McEver),which you have the certifications for,will be doing the following <br /> duties: <br /> TLS-350 Technician (Level 2/3 or 4): Contractors holding valid TLS-350 Technician Certifications are <br /> approved to perform installation checkout, startup, programming, and operations training, <br /> troubleshooting and servicing for all Veeder-Root TLS-300 or TLS-350 Series Tank Monitoring <br /> Systems, including Line Leak Detection and associated accessories. <br /> In-Station Diagnostics (ISD-PMC) Technician Certification: <br /> ISD PMC Contractors holding a valid ISD/PMC Certification are approved to perform (ISD/PMC) <br /> installation checkout, startup, programming, and operations training. This training also includes <br /> troubleshooting and service techniques for the Veeder-Root In-Station Diagnostics system. A current <br /> Veeder-Root Technician Certification is a prerequisite for the ISD/PMC course. <br /> Veeder-Root ISD/PMC including Carbon Canister Vapor Polisher Contractor Certification: <br /> This Certification includes Executive Orders 203, 204 and the Veeder-Root Vapor Polisher. This <br /> certification is required for setup and service of the Veeder-Root Vapor Polisher. <br /> The certifications for Level 1, APEC's contractors, will be faxed to you. <br /> The existing vent lines will not be modified below grade. New electrical wiring will not be installed for <br /> ISD/PMC. <br /> Rebekah Butler <br /> Project Manager <br /> American Petroleum Environmental Construction <br /> phone: 209-943-3000 <br /> fax: 209-943-3003 <br /> 3/23/2009 <br />