My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep 04 08 01 : 27p Afforda Test (2091 744-0116 p. 3 <br /> 0 checl. Ullis box if no lank ILZIMI`in!Zol-SiR eQL1iP111U:1t i� <br /> This section must be completed if in-tank- gauging equipment is used to perform leak detection monitoring. <br /> Complete the foU.3wina'cliecidist: <br /> CJ Yes 13 No* Has all input wiring been inspected for proper entry and termination, including testing for ground fILIItS? <br /> El Yes 11 No* Were all tank gauging probes Visually inspected for damage and residue buildup? <br /> 0 Yes ZI No* Was accuracy of system product level readings tested? <br /> El Yes 0 No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled property? <br /> U Yes C3 NO Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): El Check this box if LLDs are not installed. <br /> Co Tete the folio inchecklist: <br /> El No* For equipment start-up or annual equipmentWrtification, was a leak simulated to verify LLD performance? <br /> 0 N/A (Check a//that apply) Simulated leak=5;.42 3&P.h.; 0 0.1 g.p.h; LI 0.2 g.p.h. <br /> ler <br /> Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> AYes El No- Was the testing apparatus properly calibrated? <br /> Yes El No* ' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> El N/A <br /> I CY Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ,e N/A <br /> ZI Yes 13,.,No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> 13 Yes LI No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> �N/A malfunctions or fails a test? <br /> ❑ Yes 13 0* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A 1 11 <br /> Yes C] No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/)l <br />
The URL can be used to link to this page
Your browser does not support the video tag.