My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/29/2008 11:05 FAX <br /> 003/008 <br /> 7 <br /> et-i i fit "gat!` tt` I .t. ."Wit <br /> U' CIIL-L'k[Ili:;60.'-' H110 IM-1k --'ZJlUjjj'! t:JU i <br /> This scClion 1-I'lust In;C0111PICIC(I il'in-Uitik gati-hig cquil-.micilt is used to pCr1*01-11-1 k.-A dc(uCtion I lloilitkirijlL'. <br /> Conlivicte file Checklist: <br /> U 1'es Q No" Has all i11PU1 wiring been i11SPCCtLd far proper en"and termination,includiji <br /> -Tye!' -9-NO Were all tank pugin g testing for ground faults'' <br /> Y vs 13 No * Was accuracy ul"Syslem product level readings tested? <br /> U Y'vs CJ No* Was au-miracy ol-system wafer level readings tested'? <br /> U Yes U NO Were all probes reinstalled properly? <br /> ill items on the equipment njuntillacturer.'s maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will foe corrected_ <br /> G. Line Leak Detector-,(LLD): U Clieck,this box HAJ.Ds are F1111 ilwtaillvd. <br /> Osolillete the foliowin checklist: <br /> Yes Q No* For equipment start-tip or annual equipment rtification, was a leak simulated to verify LLD performance? <br /> " <br /> 0 N/A (Check ull 1hej1q[q;ly) Simulated leak ratL j - El 0.1 g.p,h- D 0.2 g.p.11, <br /> Yes U No* Were all LI,Ds confirmcd operationni and accurate within regulatory requirements*! <br /> Yes LJ No* Was the testing apparatus properly calibrated? I <br /> Yes 0 No F For mechanical LLD.,;,dies the I I.D restrict product flow if it defects a leak? <br /> U N/A <br /> El Yes 0 o* For ulcutruniv LLDs,does the turbine automatically shut off iftfle LLD detects a leak? <br /> * ��N/A <br /> (03:Yes ' Ll No* For electronic LLDs,doesthe-turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> U Yes UNo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring. system <br /> ,R"i`NIA malfunctions or rails a test? <br /> Ll Yesk_ 0 No* For electronic LLDs,have all accessible wiring connections been visually inspected?ZN/A <br /> Yes U No* Were all items on the equipment manufacturer's main(Lnanec checklist completed? <br /> In the Section 11,below,describe how staid wilep these deficiencies were or will he corrected. <br /> H. comments; Oq <br /> Nage 3 of 3 03M] <br />
The URL can be used to link to this page
Your browser does not support the video tag.