Laserfiche WebLink
08/29/2008 11:05 FAX <br /> 003/008 <br /> 7 <br /> et-i i fit "gat!` tt` I .t. ."Wit <br /> U' CIIL-L'k[Ili:;60.'-' H110 IM-1k --'ZJlUjjj'! t:JU i <br /> This scClion 1-I'lust In;C0111PICIC(I il'in-Uitik gati-hig cquil-.micilt is used to pCr1*01-11-1 k.-A dc(uCtion I lloilitkirijlL'. <br /> Conlivicte file Checklist: <br /> U 1'es Q No" Has all i11PU1 wiring been i11SPCCtLd far proper en"and termination,includiji <br /> -Tye!' -9-NO Were all tank pugin g testing for ground faults'' <br /> Y vs 13 No * Was accuracy ul"Syslem product level readings tested? <br /> U Y'vs CJ No* Was au-miracy ol-system wafer level readings tested'? <br /> U Yes U NO Were all probes reinstalled properly? <br /> ill items on the equipment njuntillacturer.'s maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will foe corrected_ <br /> G. Line Leak Detector-,(LLD): U Clieck,this box HAJ.Ds are F1111 ilwtaillvd. <br /> Osolillete the foliowin checklist: <br /> Yes Q No* For equipment start-tip or annual equipment rtification, was a leak simulated to verify LLD performance? <br /> " <br /> 0 N/A (Check ull 1hej1q[q;ly) Simulated leak ratL j - El 0.1 g.p,h- D 0.2 g.p.11, <br /> Yes U No* Were all LI,Ds confirmcd operationni and accurate within regulatory requirements*! <br /> Yes LJ No* Was the testing apparatus properly calibrated? I <br /> Yes 0 No F For mechanical LLD.,;,dies the I I.D restrict product flow if it defects a leak? <br /> U N/A <br /> El Yes 0 o* For ulcutruniv LLDs,does the turbine automatically shut off iftfle LLD detects a leak? <br /> * ��N/A <br /> (03:Yes ' Ll No* For electronic LLDs,doesthe-turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> U Yes UNo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring. system <br /> ,R"i`NIA malfunctions or rails a test? <br /> Ll Yesk_ 0 No* For electronic LLDs,have all accessible wiring connections been visually inspected?ZN/A <br /> Yes U No* Were all items on the equipment manufacturer's main(Lnanec checklist completed? <br /> In the Section 11,below,describe how staid wilep these deficiencies were or will he corrected. <br /> H. comments; Oq <br /> Nage 3 of 3 03M] <br />