Laserfiche WebLink
sofrware Version Installed: /J `V/ <br /> ;ME] <br /> the following checklist: <br /> ❑ No* Is the audible alarm o erational? <br /> No* Is the visual alarm operational? <br /> Yes ❑ No* Were all sensors visually ins ected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ;L3Yes No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes U No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> U N/A monitoring system detects a leak,fails to ope or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) sump/Trench Sensors; ❑ Dispenser C ntainment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failureldisconnection?A Yes; ❑No. <br /> O Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overTill warning device (i.e. no <br /> �N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what.percent of tank capacity does the alarm trigger? <br /> Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> -:23and list the manufacturer name and model for all replacement parts in Section E,below. <br /> 3 Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check al/that applw <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> _. Yes I ❑ No* I Is all monitoring equipment oerational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Pale 2 of 3 03/01 <br />