Laserfiche WebLink
Sep 26 06 10: 59a Rff la Test (209) 744-0116 p. 5 <br /> Siie Address; F L- 'DCV.At�O <br /> ca . . . . . . . . . . . . . . . . . . . . . . . <br /> .y . <br /> - : r7-1 - <br /> . . <br /> - : : : : : : : : : : Q . . . : : : . . . . . . : : : : : : : : : : : <br /> Sumits <br /> . . . . . . . . . . . . <br /> t ile rnap was drawn: <br /> Cnstrivetions <br /> If you already have a diagram that shows all required inilormation, you nmy include it, rather than this Pagc, <br /> with your Monitorii g System Certification. On your plan, `how the general layout of tanks and Piping. <br /> Clearly identify locations of the fo <br /> spaces, sumps, dispenser bans, spill containers, or other secondary containment areas; <br /> mechanical or electionie litre leak detectors, and in-tank liquid level probes (if used for leak detection). In the <br /> space provided, noto the date this flan was prepared. <br /> osmo <br />