Laserfiche WebLink
S W RCB,January 2002 Page of <br /> Secondary Containment Testing Report Form <br /> 'Phis form is intended�r,uspjV 2ctors performing periodic testing of UST secondary containment systems. Use the <br /> appropria form to report results for all components tested The completed form, written res, and <br /> printoutsfrom tests(if applt�gbl #1FaYuld be provided to the facility owner/operator for submittal to the Ioc��lf <br /> SAN, FY I±d U S T t'L TI. FACILITY INFORMATION S '; ::)�1 2 <br /> Facility Na*Mlt: J&L MarketI Date of Testing: HE Xtv T 5 "r rAl <br /> Facility Address: 8115 S. El Dorado Street,French Camp Ca 95321 r A H r�1El,f T <br /> Facility Contact: Jim Phone: 209-982-0912 <br /> Date Local Agency Was Notified of Testing: 8/25/05 <br /> Name of Local Agency Inspector('(present during testing): None Present <br /> 2. TESTING CONTRACTOR INFORMATION SEP _ <br /> Company Name: JP Petroleum Service <br /> Technician Conducting Test: John Puumala ENVIRONPILN I HLALTH <br /> Credentials: x CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester ` ' -S <br /> License Type: A License Number: 811471 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Pipe Sump 1 x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Pipe Sump 2 x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Pipe Sump 3 x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Line 1 x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Line 2 x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Line 3 x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1&2 x ❑ ❑ x ❑ ❑ ❑ ❑ <br /> UDC 3&4 x ❑ ❑ x ❑ ❑ ❑ ❑ <br /> UDC 5&6 x ❑ ❑ x ❑ ❑ ❑ ❑ <br /> UDC 7&8 x ❑ ❑ x ❑ ❑ ❑ ❑ <br /> Annular 1 (Diesel/Premium) x ❑ ❑ ❑ ❑ ❑ ED 11Annular 2 (Regular) x L1 El 11 ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Water was filtered and pumped back to holding tank. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signa _- Date: <br />