Laserfiche WebLink
D. Results of Testing/ServicL6 <br /> Software Version Installed: <br /> Compete the following checklist: <br /> FI <br /> Ye C3No* Is the audible alarm operational? <br /> LlNo* Is the visual alarm operational? <br /> I ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ Iyo* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> r�N/A operational? <br /> O-Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Er§u-mp/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? dr es; ❑ No. <br /> ❑ Yes ❑ Ngo* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> & N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> ." and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* Ur No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes, describe causes in Section E,below. <br /> * Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> J Yes I ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />