My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Name �'��.Afforda-Test <br /> Address 1:F//e— 5, —4 k-Z"W � <br /> PO Bog 36 26515 N. Sacramento Blvd <br /> Thornton, Ca. 95686 �t 1 b` <br /> 209 794-0102 Fax 209 794-0112 <br /> Phone <br /> Equipment: <br /> EZY 3 LOCATOR PLUS Test Date 3 /pr <br /> Tank # Tank Product R U J- Ulla e Volume -;?1 Tank Size / <br /> PRESSURE SENSOR CALCULATION WATER SENSOR CALIBRATION <br /> Prod. Prod. PSI <br /> " lbf X Wt ,�j x-10 = (I) 2Cal #1 Cal#2 Cal#3 <br /> " Water PSI <br /> AVERAGE: <br /> In Tank X .036 = (2) D? <br /> PSI <br /> (1) + (2) = Positive Head Pressure in Tank = (3) , 32 Water Intrusion Test Period: Began <br /> 11 Ended <br /> Outsider Tank U X .036 = OI O <br /> PSI Test Period Calculation: <br /> (3)Hd Pressure - (4) Outside Water Pressure = (5) 3 +/- <br /> PSI / 3780 = / .05 = <br /> (5) ,3 D + .5 PSI + (6) Avg "A"Factor Test Time <br /> PSI <br /> TEST PRESSURE _ PS �"y +/- Groundwater Depth Determination: <br /> If(6)is less than.5 PSI,(7)shall be.5 PSI <br /> By: <br /> Where or How: 'C�PlCC CW // or I <br /> TIME PRESSURE 1 <br /> Height <br /> Blower Started / -36— -;5-L5 '- <br /> Test Pressure Reached �! �� soTo <br /> �� To <br /> Product Grade <br /> Blower Turned Off / /�_ �� inI /-�-�--" Ground <br /> n Tank I Water <br /> Test Began / /Y'9 Dia. �— <br /> Water in <br /> Test Ended // /.[��j Tank <br /> PASS Water Sensor Indication:- <br /> FAIL <br /> ndication:FAIL Water Intrusion No Water N/A X <br /> Ullage (Dry) <br /> Product Level (Wet) Technician: Lyle imo <br /> INCONCLUSIVE Signature: <br /> OTTL# 97-114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.