Laserfiche WebLink
Aft Alhk <br /> SAN JOAQW COUNTY ENVIRONMENTAL HEALTH MPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE A MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mn <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I..FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ <br /> FACILITY NAME 2y M03. <br /> FACILITY SITE ADDRESS J M04" CITY `t L Mos. <br /> II..EQUIPMENT.TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mob. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1 ANNUALLY ❑ 99.OTHER(Specify): MOT <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location ofeach sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING ME'HOD(S):(Check all that apply) Mlo. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT'hS: A a.DRY b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MI1. <br /> PANEL MANUFACTURER: V�' --ii J E T M'2- MODEL#: r2-3-G..--Y-;7r,Q MD. <br /> LEAK SENSOR MANUFACTURER M14- MODEL#(S): 11� � MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM t&ED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: Mt6- MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: M18. MODEL#(S): MM <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c_OTHER(Specify): M.M. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b_60 HOURS M7.5. <br /> W5.INTEGRrrY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: *a.ANNUALLY ❑ b.BIENNIALLY ❑ c_OTHER(Specify): M26. M27. <br /> ❑ <br /> 6.VISUAL MONITORING DONE: a DAILY ❑ b.WEEKLY(Regwmsagency approval) <br /> ❑ 99.OTHER(Specify): �& <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT)} 0 a.DRY ❑ b_LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: 102- MODEL#: W3. <br /> LEAK SENSOR MANUFACTURER: oda ag, 1 h. M34. MODEL#(S): !d b Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AT MA-11C PUMP(i.e.,TURBINE)SHUTDOWN? T -b-" YES ❑ b.NO 106. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? R-a.YES ❑ b.NO M37- <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h LEAK TESTS AND RESTRICTS OR SHUTS O <br /> PRODUCT FLOW WHEN A LEAK IS ETECTED <br /> MLLD MANUFACTURER(s): 1 1, r INS f P T Ll \ �8 MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINEO PERFORMS 3.0 g p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41 <br /> PROGRAMMED LINENTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.lt ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M41 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> fk'3-VISUAL MONfTORING DONE: ❑ a.DAILY ❑ b.WEEKLY* c.MiN.MONTHLY do EACH TIME SYSTEM OPERATED" M47. <br /> •Requires agency approval **Allow loonibiing of unburied emergency gmerator fid ping only per IISC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />