Laserfiche WebLink
Evaporation and percolation from the pond are estimated in the table below ('fable 4). In some <br /> circumstances, the pond may not be adequate to handle 25 gpm. For this reason a contingency <br /> will be prepared to handle excess water by piping to the existing treatment plant, used for wash <br /> water. 'llie maximum amount of excess water predicted is 9.9 gpm in winter. Tlie capacity of the <br /> treatment plant is 40 gpm. l'be treatment plant is not used in winter. In addition the quality Of <br /> groundwater is much higher than the wash water for which the plant was designed. <br /> Excess water will pass through the air strippers and be tested according to an operations plan <br /> being prepared for submission to the Regional Board. If effluent chloroform levels are below <br /> WI)lk the water will be released to the stormwater pond adjacent to the treatment plant. If not, <br /> groundwater will cycle back through the plant or will be sent to a monitored spray field where <br /> additional volatilization will occur. /application to the spray field in summer will be coordinated <br /> with wash treatment water releases so as not to over apply. Lysimeters installed near the surface <br /> in the spray field will be used to detect chloroform, which in the event of migration, could escape <br /> to the subsurface. 'llie spray field will be located upgradient of the extraction well. <br /> Table 4. Water Balance to Aeration Pond For Winter and Summer Operation <br /> Item with assumptions November(iVlean) July(mean) <br /> (inches) (inches) <br /> Influx from 25 g�»n pumping onto 50x 100 ft pond 11.6 11.6 <br /> Evaporation from spray is25% of spray volume in -1.8 -4.6 <br /> summer and 10% of spray volume in winter <br /> assumes 40 gpin spray volume <br /> Evaporation from surface -0.06 -0.42 <br /> Estimate of infiltration (based on pumping test, assuming -5.1 -5.1 <br /> Kh — 4.32 11/d and anisotropy of Kh/Kv =10) <br /> Daily excess water in pond 4.6 1.4 <br /> Excess water to be extracted from pond per day 9.9 gpm 3.0 gpm <br /> L, 14 <br /> CONDOR <br />