My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:34:50 AM
Creation date
5/3/2019 2:18:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Qualified Facility Inspection Report <br /> _____TFacility Name: Facility Address: Date: <br /> J & I.. MARKET 8115 S EL DORADO ST. FRENCH CAMP Ma 26, 2016 <br /> Qualified Facility-Tier II <br /> 508 CFR 112.6(b)(4)(i)(C) PE failed to attest that sections 112.6(b)(3)(i)/(ii)are consistent with good engineering practices r V r R r COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section ❑V ❑R ❑COS <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan o V ❑R o COS <br /> 603 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable u V ❑R ❑COS <br /> 604 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers,transfer stations,and pipes ■V u R o COS <br /> 605 CFR 112.7(a)(3) I Plan failed to address facility layout,operations discharge prevention methods and containers I ■V o R ■COS <br /> 606 CFR 112.7(a)(4) Plan failed to contain procedures for reporting a discharge o V o R o COS <br /> 607 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan ❑V ❑R o COS <br /> 608 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑V u R u COS <br /> 609 CFR 112.7(c) Failed to provide secondary containment,diversionary structures,or equipment to prevent discharge ■V ❑R ❑COS <br /> 610 CFR 112.7(d) Full or partial PE certified Plan failed to explain impracticability ❑V o R r COS <br /> 611 CFR 112.7(d)(1) Full or partial PE certified Plan failed to include spill contingency if no response plan submitted o V o R ❑COS <br /> 612 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge o V o R o COS <br /> 613 CFR 112.7(e) Failed to conduct inspections or maintain records for 3 years ■V o R ❑COS <br /> 614 CFR 112.7(f)(1) Failed to train personnel on discharge prevention ■V in R o COS <br /> 615 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention in V o R ❑COS <br /> 616 CFR 112.7(f)(3) Failed to schedule and conduct discharge prevention briefings at least annually ■V u R u COS <br /> 617 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting u V o R ❑COS <br /> 618 CFR 112.7(h)(1) Loading/unloading rack containment system not properly sized u V ❑R ❑COS <br /> 619 CFR 112.7(h)(2) Failed to provide vehicular departure system loading and unloading racks o V u R o COS <br /> 620 CFR 112.7(h)(3) Failed to inspect lowermost drains and outlets prior to filling and departure of vehicles u V u R u COS <br /> 621 CFR 112.7(i) Failed to evaluate field constructed container for brittle fracture and take appropriate action ❑V ❑R ❑COS <br /> 622 CFR 112.70) Failed to include discussion of conformance to discharge prevention and containment procedures n V n R n COS <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 701 CFR 112.8(b)(2) Failed to use manual open-and-closed design valves for the drainage of diked areas ■V R COS <br /> 702 CFR 112.8(b)(3), Failed to design facility drainage system from undiked areas to retain in the facility ❑V ❑R u COS <br /> 112.8(b)(4) <br /> 703 CFR 112.8(b)(5) Failed to provide two lift pumps for more than one continuous treatment unit ❑V o R ❑COS <br /> 704 CFR 112.8(c)(2) Diked area is not sufficiently impervious to contain discharged oil ■V o R c COS <br /> 705 CFR 112.8(c)(1) Container not compatible with oil stored and/or storage conditions u V o R u COS <br /> 706 CFR 112.8(c)(2) Failed to provide and maintain adequate secondary containment ■V ❑R u COS <br /> 707 CFR 112.8(c)(3)(i) Failed to keep containment bypass valves closed when not draining rainy tie,4L, ia.r. I ■V u R u COS <br /> 708 CFR 112.8(c)(3)(ii) Failed to inspect retained rainwater prior to discharge ■V ❑R o COS <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.