My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:36:46 PM
Creation date
5/6/2019 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PROVISIONS <br /> I. VALIDATION/REVOCATION—This permit is not valid unless signed by the Public Works Director or his authorized representative. This permit is non- <br /> transferable and is void if work is not completed prior to expiration date. An extension may be granted if such is requested forty-eight(48)hours before the. <br /> permit expires. <br /> !. ACCEPTANCE OF PROVISIONS—It is understood and agreed by the permittee that the performing of any work under the permit shall constitute an <br /> acceptance of the provisions. <br /> 1. KEEP PERMIT AT JOBSITE—The permit and control number shall be kept on the jobsite and shall be shown to any representative of the City requesting <br /> verification of permit issuance. <br /> 1. INSPECTION AND APPROVAL—A minimum of 24 hours notice shall be required prior to placing any backfill,connection to any existing facility,or the <br /> placement of any concrete or asphalt paving. Inspection shall not be deemed a waiver on the part of the City of the right to demand correction of defects <br /> discovered at a subsequent date. <br /> i. STANDARD PLANS AND SPECIFICATIONS—All work shall conform to the City of Stockton Standard Plans and Specifications. <br /> SURVEY MONUMENT PRESERVATION—Any monuments including,but not limited to, chisel crosses,witness corners,and iron pins that control the <br /> location of subdivisions,tracts,boundaries,property lines,roads.streets,or provide survey controls,and that may be disturbed or destroyed during <br /> construction,shall be referenced by a licensed land surveyor and reset in the surface of the new construction or set a permanent witness monument. <br /> Corner records or Records of Survey shall be filed as required. (California Business and Professions Code 8771 and California Streets and Highways <br /> Code 732.5, 1492.5, 1810.5) <br /> MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC—All work shall be planned and carried out so there will be the least possible <br /> inconvenience to the traveling public. Placing of lights,barricades,warning signs and other safety devices required for public safety shall be the <br /> responsibility of the permittee. All work-zone traffic controls shall be in accordance with the most current revision of Chapter 5 of the State of California, <br /> Department of Transportation Traffic Manual. <br /> STANDARD WORKING HOURS—All work shall be restricted to the hours between 8:30 a.m. and 4:30 p.m.,except on arterials and collectors where the <br /> work is,limited to the hours between 9:00 a.m.and 3:00 p.m.,unless otherwise noted on this permit. <br /> FAILURE TO COMPLY WITH GENERAL PROVISIONS—The permittee agrees to reimburse the City for performing all work and furnishing all materials to <br /> correct any failure to comply with these provisions,as well as all applicable City Ordinances and Standard Plans and Specifications currently in effect. <br /> c <br /> 0. NOTIFICATION OF UTILITY COMPANY—The permittee shall notify utility companies 48 hours prior to beginning any construction,which may involve <br /> underground or overhead facilities and will pay all expenses for any removal or relocation necessary. Valves on water mains may not be turned off without <br /> permission of the utility company involved. <br /> 1. NOTIFICATION OF POLICE,FIRE AND PUBLIC WORKS DEPARTMENTS—When streets are to be blocked,the Police, Fire and Public Works <br /> Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered. Access to fire hydrants shall be maintained <br /> at all times. Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer. <br /> 2. CLEANUP OF JOBSITE—The permittee will remove any refuse material from the jobsite within three days after completion of the work. <br /> 3. DELINQUENT BILLS—Failure to pay any delinquent bill accrued under any previous permit issued by the Public Works Department will be cause for <br /> rendering the applicant ineligible for any other permit from the Public Works Department until such bill is paid. <br /> 4. MEETING EXISTING IMPROVEMENT—The permittee shall be responsible for meeting all adjacent frontage improvements such as paving and sidewalks. <br /> S. PARKING METER AND TRAFFIC SIGN REMOVAL—The permittee shall contact either the Traffic Maintenance Supervisor at(209)937-7408,or the <br /> Senior Public Works Supervisor at(209)937-8534 of the Public Works Traffic Devices Section,at least 48 hours prior to any parking meter or traffic sign <br /> removal. <br /> ***IMPORTANT*** <br /> MANDATORY Encroachment Permit Procedures <br /> o provide a more efficient and economical inspection service for Encroachment Permit construction,the following procedure shall be followed by all permittees: <br /> 1. Notify the Permit Engineer, (209)937-8366,to obtain a control number,no less than 24 hours,but not in excess of 72 hours prior to the start of work, <br /> and prior to any required inspections as identified below: If work does not begin within 72 hours of the issuance of a control number,the control <br /> number will be invalid and the permittee shall call for a new control number. (For.City Capital Improvement Projects or subdivision improvements, <br /> permittee shall contact the assigned City Project Engineer at(209)937-8411 for specific instructions prior to the beginning of any work.) <br /> 2. Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction. <br /> 3. Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work. <br /> 4. Notify Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection. <br /> 5. .Notify the Permit Engineer upon completion of construction at(209)937-8366. <br /> REQUIRED INSPECTIONS <br /> fisted below are several types of construction and points at which inspections must be made,prior to continuing construction operation. Unauthorized <br /> )ntinuance of construction beyond and inspection point may result in rejection of all work. <br /> CONCRETE: PIPE INSTALLATION: <br /> 1. Grade and excavate before forming 1. Excavation and bedding <br /> 2. Forming before placement of concrete 2. Pipe installation and/or utility connections <br /> 3. Beginning and during asphalt paving 3. Backfill(compaction test may be required) <br /> 4. Cleanup and final approval 4. Beginning and during asphalt paving <br /> 5. Final approval <br /> X068 L66 602 <br /> � 'd 1068-LEG (GOz) 4TWJaA_ITIAUDalloaac An anT , <br />
The URL can be used to link to this page
Your browser does not support the video tag.