My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:36:46 PM
Creation date
5/6/2019 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SOIL AND GROUNDWATER REMEDIATION REPORT <br /> FORMER CARANDO MACHINE WORKS <br /> 420 NORTH MADISON STREET <br /> Stockton,California <br /> 1.0 INTRODUCTION <br /> This report documents the soil and groundwater remediation work performed at the former <br /> Carando Machine Works Site(Site) at 420 North Madison Street(Figures 1 &2). The City of <br /> Stockton(City)owns the Si Site, &Rollo, Inc. (Treadwell&Rollo)was retained by <br /> the City for environmental consulting services. The San Joaquin County Environmental Health <br /> Department(SJCEHD) is overseeing the soil and groundwater characterization and remediation <br /> work at the Site related to releases from underground storage tanks(USTs) at the former on-site <br /> gasoline service station. <br /> The objective of this remediation project was to mitigate soil and groundwater contamination <br /> from leaking USTs and to place an oxygen releasing compound in the subsurface to expedite and <br /> assist in-situ bioremediation of the petroleum contaminants. During April 2005,the soil <br /> remediation was conducted in conformance with the 14 February 2005 workplan titled <br /> Remediation and Groundwater Monitoring Workplan, Former Carando Site, 420 North Madison <br /> Street, Stockton, California(Treadwell&Rollo 2005a),which was approved by the SJCEHD in <br /> a letter.dated 3 March 2005(SJCEHD 2005a). The approval letter is included in Appendix A. <br /> This report presents the following: <br /> 1. Our findings regarding previous site uses and investigations; <br /> 2. Soil and groundwater remediation methodologies; and <br /> 3. Sampling results and laboratory analytical methods used during our remediation program <br /> I <br /> i <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.