Laserfiche WebLink
z <br /> STANDARD OPERATING PROCEDURE FOR <br /> GROUNDWATER MONITORING WELL SAMPLING <br /> PURPOSE <br /> The purpose of this standard operating procedure is.to delineate protocols for the collection of <br /> groundwater samples from <br /> g p monitoring wells using normal and slow purging technique. <br /> FIELD SUPPLIES <br /> • Specific Conductivity meter- or YSI 3800 <br /> • Thermometer (.optional) - or YSI 3800 <br /> • pH meter or YSI 3800 <br /> Flow-through-cell, if dissolved oxygen (DO).and oxidation reduction potential (ORP) <br /> measurements are needed. <br /> • Water-level indicator <br /> • Peristaltic, bladder, or submersible positive-displacement pump with adjustable discharge <br /> rate <br /> • Sample bottles, labels, sample cooler, ice, chain-of-custody forms <br /> • Logbook or Field Investigation Daily Forms and Groundwater Sampling Forms . <br /> • Teflon or teflon-lined polyethylene tubing and T fittings, hose clamps <br /> r • Photoionization Detector(PID) Organic Vapor Analyzer <br /> • PPE <br /> • Graduated cylinders <br /> • Generator <br /> • Laboratory contact name and number <br /> • List of wells with historic COC concentrations. <br /> • Decontamination equipment (buckets, non-phosphate detergent, and distilled water) <br /> • Calibration fluids <br /> gw sampling.SOP Page 1 of 5 February 2005 <br /> ae <br />