My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:34:57 PM
Creation date
5/6/2019 4:21:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Material description for rock samples include, as appropriate: <br /> • Classification <br /> 0 Litholog is Characteristics <br /> • Bedding/Banding Characteristics <br /> • Color <br /> • Hardness <br /> o Degree of Cementation <br /> • Texture <br /> • Structure and Orientation <br /> • Degree of Weathering <br /> i • Solution or Void Conditions - <br /> • Primary and Secondary Permeability <br /> • Sample Recovery <br /> 9 Incidental odors <br /> • PID readings' <br /> • Staining <br /> Well Construction <br /> LAfter the.hole is drilled and logged, backfill hole as required for proper screen/sump <br /> placement. <br /> LIn unconfined aquifers where floating product and/or tidal fluctuation is anticipated, the <br /> screen will extend 2 feet above the water table. If feasible, the bottom of the screened <br /> section will rest at or just below the top of the aquitard. The 2-foot length of plugged <br /> riser section will be in place below the screen, if a.sump is required. <br /> • The installation of monitoring wells in uncased or partially cased holes will begin <br /> within 12 hours of completion of drilling,'or if the hole is to be logged, within 12 <br /> hours of well logging, and within 48 hours for holes fully cased with temporary drill <br /> Page 5 of 9 <br /> well—install—SOP MONITORING WELL INSTALLATION February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.